Friday, November 30, 2012

I'm pooped!

I successfully completed my all nighter last night. My brain's so tired I'm having a hard time figuring out what I got accomplished! lol I got 2 coats of paint on the base cupboards and 2 coats of paint on all the drawers, I only have 1 coat of paint left on the backside of the 23 doors I was working on. I REALLY want to paint that last coat tonight so I can start re-installing them tomorrow, but re-installing them tomorrow is kind of a pipe dream because I need to cut some 1 1/2" blocks for my Primary class for Sunday and I need to bake and frost a cake and clean up the dining room because Middleton's are coming over to celebrate Wendy's birthday. I do already have the TexMex lasagna in the fridge ready to be baked, premixed salad and french bread. So the cake is really the only food that needs preparation time.

I guess if I get those other things done and I still have time I'll paint some more! I also painted the first coat on the vanity in the basement bathroom. I decided I'm not going to refinish the countertop in the bathroom and install a new backsplash, I'll just replace the sink. That bathroom needs remodeling anyway (the shower needs to be updated, I'm pretty sure it's original 1967!) and who knows if I remodeled if people would want to keep it or would end up remodeling themselves. I really need to take a picture of the shower, just for posterity's sake! lol

And speaking of pictures, here are some updates after today's marathon:
Uh yeah, that's right...we're seeing progress!!
I really like the drawer pulls I chose. They are very simple but I think quite classy looking. The cupboard doors will have a round pull.

I like it...I like it a LOT!

No comments:

Post a Comment